Close Menu
Global News HQ
    What's Hot

    Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy

    June 19, 2025

    We’ve Tested Dozens of OLEDs to Find the Best

    June 19, 2025

    NYC’s top deals: UBS exec snags combined condo at 50 W. 66th

    June 19, 2025
    Recent Posts
    • Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy
    • We’ve Tested Dozens of OLEDs to Find the Best
    • NYC’s top deals: UBS exec snags combined condo at 50 W. 66th
    • Elon Musk’s X to offer investment and trading in ‘super app’ push
    • Bitcoin’s Momentum Wobbles—Analyst Predicts Correction Below $94K
    Facebook X (Twitter) Instagram YouTube TikTok
    Trending
    • Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy
    • We’ve Tested Dozens of OLEDs to Find the Best
    • NYC’s top deals: UBS exec snags combined condo at 50 W. 66th
    • Elon Musk’s X to offer investment and trading in ‘super app’ push
    • Bitcoin’s Momentum Wobbles—Analyst Predicts Correction Below $94K
    • What’s open and closed on Juneteenth 2025? Stocks, banks, grocery stores, post office, pharmacies, more
    • Luxury Sector Will Continue to Slip, Bain Forecasts
    • Try This Sheet Pan Salmon With Potatoes, Broccoli & Cilantro Sauce
    Global News HQ
    • Technology & Gadgets
    • Travel & Tourism (Luxury)
    • Health & Wellness (Specialized)
    • Home Improvement & Remodeling
    • Luxury Goods & Services
    • Home
    • Finance & Investment
    • Insurance
    • Legal
    • Real Estate
    • More
      • Cryptocurrency & Blockchain
      • E-commerce & Retail
      • Business & Entrepreneurship
      • Automotive (Car Deals & Maintenance)
    Global News HQ
    Home - Legal - Texas Senate Bill 6 and Impacts on Large Load Development in ERCOT
    Legal

    Texas Senate Bill 6 and Impacts on Large Load Development in ERCOT

    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Texas Senate Bill 6 and Impacts on Large Load Development in ERCOT
    Share
    Facebook Twitter LinkedIn Pinterest Email


    On 12 February 2025, Texas Senate Bill 6 (SB6), authored by Sen. Phil King and Sen. Charles Schwertner, was filed. The low bill number on this indicates it is a priority bill and will likely have momentum. If passed, this bill will directly impact entities currently in or contemplating a co-location arrangement in the Electric Reliability Council of Texas (ERCOT) region. A co-location arrangement is where generation and load are located at the same point on the grid.

    If passed, SB6 would require the Texas Public Utility Commission (PUC) to, “implement minimum rates that require all retail customers in that region [ERCOT] served behind-the-meter to pay retail transmission charges based on a percentage of the customer”s non-coincident peak demand from the utility system as identified in the customer’s service agreement.” Many large load entities have pursued co-location arrangements to avoid transmission costs so if passed this will result in a shift. The bill would require the PUC to develop standards for interconnecting large loads in a way to “support business development” in Texas “while minimizing the potential for stranded infrastructure costs.”

    Additionally, SB6, if passed, would require the PUC to establish standards for interconnecting large load customers at transmission voltage in ERCOT.  SB6 would have these interconnection standards apply to facilities with a demand of 75 MW or more but allows the PUC to determine a lower threshold if necessary.  As part of these interconnection standards, the large load customer must disclose to the utility whether the customer is pursuing a duplicate request for electric service in another location (both within and outside of Texas), the approval of that duplicative request would cause the customer to change or withdraw their interconnection request. This likely would result in the utility having a better sense of which large load will move forward in the interconnection queue versus those that are duplicative. The large load customer would also be required to disclose information about its on-site backup generating facilities. The bill would allow ERCOT, after reasonable notice, to deploy the customer’s on-site backup generating facility. As part of the PUC standards for interconnection, the large load customer would have to provide proof of financial commitment which may include security on a dollar per MW basis, as set by the PUC.

    SB6 also requires a co-located power generation company, municipally owned utility, or electric cooperative, to submit a notice to the PUC and ERCOT before implementing a new net metering arrangement between a registered generation resource and an unaffiliated retail customer if the retail customer’s demand exceeds 10% of the unit’s nameplate capacity and the facility owner has not proposed to construct an equal amount of replacement capacity in the same general area.  Additionally, SB6 would require a new net metering arrangement be consented to by the electric cooperative, electric utility, or municipally owned utility certified to provide retail electric service at the location. The PUCT would have 180 days to approve, deny, or impose reasonable conditions on the proposed net metering arrangement, as necessary to maintain system reliability. Such conditions may include:

    • That behind-the-meter load ramp down during certain events;
    • That generation reenter energy markets in the ERCOT power region during certain events; and
    • That the generation resource will be held liable for stranded or underutilized transmission assets resulting from the behind-the-meter operation.

    If the PUC does not act within the 180-day period, the arrangement would be deemed approved.

    SB6 would also require large load that is interconnected after 31 December 2025 to install equipment that allows the load to be remotely disconnected during firm load shed.   Finally, SB6 would require the PUC to study whether 4 Coincident Peak transmission cost allocation is appropriate.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Previous ArticleArgentina’s president Javier Milei says he did not promote $LIBRA token, just shared it
    Next Article DUAL Group launches rebrand

    Related Posts

    When Is a Car a Character? The Ninth Circuit Revisits Copyrightability in Halicki v. Carroll Shelby Licensing

    June 19, 2025

    Alito Doesn’t Think Trans Children Deserve The Strict Scrutiny Standard – See Also – Above the Law

    June 19, 2025

    Watching environmental law get eclipsed by Skrmetti

    June 19, 2025

    Johnson & Johnson Loses $8M Talc Verdict in Boston | Law.com

    June 19, 2025
    Leave A Reply Cancel Reply

    ads
    Don't Miss
    Travel & Tourism (Luxury)
    8 Mins Read

    Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy

    This is what AvGeek dreams are made of.Several of us at TPG got a behind-the-scenes…

    We’ve Tested Dozens of OLEDs to Find the Best

    June 19, 2025

    NYC’s top deals: UBS exec snags combined condo at 50 W. 66th

    June 19, 2025

    Elon Musk’s X to offer investment and trading in ‘super app’ push

    June 19, 2025
    Top
    Travel & Tourism (Luxury)
    8 Mins Read

    Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy

    This is what AvGeek dreams are made of.Several of us at TPG got a behind-the-scenes…

    We’ve Tested Dozens of OLEDs to Find the Best

    June 19, 2025

    NYC’s top deals: UBS exec snags combined condo at 50 W. 66th

    June 19, 2025
    Our Picks
    Travel & Tourism (Luxury)
    8 Mins Read

    Behind the scenes at American Airlines’ giant Fort Worth campus and DFW – The Points Guy

    This is what AvGeek dreams are made of.Several of us at TPG got a behind-the-scenes…

    Technology & Gadgets
    2 Mins Read

    We’ve Tested Dozens of OLEDs to Find the Best

    Honorable MentionEvery OLED we’ve tested is a great TV, and older models are often on…

    Pages
    • About Us
    • Contact Us
    • Disclaimer
    • Homepage
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube TikTok
    • Home
    © 2025 Global News HQ .

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version